The EVM Site Selection Tool User Guide
18 September 2010
| Publication
Overview
This document describes how to choose the sites for an EVM assessment. The first
step is to collect basic data on the country’s immunization supply chain. These data
are then used to select sites in a systematic manner so that the sample is
representative of the whole supply chain; the results of the EVM assessment should
then provide a valid picture of its strengths and weaknesses. This selection process
must be done in a standardized way to ensure that results within and across
countries can be interpreted and compared in a consistent way.
WHO Team
Essential Programme on Immunization (EPI),
Immunization, Vaccines and Biologicals (IVB)
Number of pages
23